ABSTRACT
This paper mentions the modified bus impedence matrix model applying to power flow
optimization, and compares this model with the augmented rectangular system model with an eigen-
image matrix. The modified expressions to compute the bus PV voltages are shown and a new
p_power loss coefficient expression is proposed for the power flow optimization computation. To
compare the different models of power flow optimization we propose a new modified estimative
matrix for a method estimating the technico-economic equivalent states, and appreciating the optimum
conditions of p_power generation between electric generators in a power system using the largest
eigenvalue of an estimative matrix relating to the p_power loss coefficients and the system economic
incremental fuel cost.
model, the second is related to eigen-image
vector power flow model [1].
1. INTRODUCTION
Power flow is the most frequently
performed study for power system. The power
flow problem involves determining voltage and
line flow, in a large electrical network, for a
given load and generation schedule. Many
important contributions have been made on this
along the years. Any improvement to its method
on storage, convergence, and reliability is of
value.
The method introduced in [2] is used to
determine the size of the technico-economic
equivalent area, therefore, we can compare the
two methods by estimating the accuracy of the
realization of optimum condition in power
system operation.
2. MODIFIED ZBUS MODEL AND
P_POWER FLOW OPTIMIZATION.
The bus impedence matrix (zbus) power
flow model is one of the known models for
power flow calculation. In this paper we present
a modified zbus power flow algorithm and its
development applying in power flow
optimization. The combination of many agents
will cause not only one optimum operation point
but also a technico-economic equivalent area
where exist many technico-economic equivalent
operation points. These agents, such as
generator fuel cost functions, the bus load
powers, the network resistances, inductances
and capacitances, etc. are approximately
determined, and the optimization algorithm with
some simplified assumtion can result in small
errors. We will compare new loss coefficient
expressions that are developed in the two
p_power optimization algorithms, in which the
first is related to modified zbus power flow
Let’s examine an electrical power system
comprising m generators. In all practical cases,
the fuel cost of generator i can be represented as
quadratic function Ci of p_power generation Pig
(1)
Ci= aiP2 + biPig + ci ; i=1,2,…,m.
ig
The economic p_power dispatching problem
is to minimize the overall generating cost Ci. In
case of applying the zbus model, it can develop
into the following equations [3]
(2)
P
2g
b1
b2
1g
a1
1
Bo1
Bo2
B11
B21
B12
...
B1m
B2m
1
a2
B22 ...
:
:
:
1
2
:
:
:
:
:
:
:
:
:
:
:
am
bm
Bm1
Bm2
...
Bmm
1
Bom
mg
(5)
where Pig is generator p_power;
is system
2
N
incremental fuel cost;
coefficients [3]
Bij are the loss
)
jT(k
Q(jk )TX(k
)
R
j
Vo
Vj(k
(3)
Vi(k)
;
;
Nb
Rk
2
Bij
(Re[Cki ]Re[Ckj
]
Im[Cki ]Im[Ckj]) ;
N
k 1(0.5(Vi Vj))2
)
Vo
jT(k
Q(jk TR(k
)
X
j
Vj(k
N
(4)
Boi
2
jPLj ;
j 1
(6)
N
jT(k
Q(jk )TR(k
)
)
)
X
j
where Nb is the branch quantity of network; N
is the bus number quantity of network; Rk is
the resistance of branch k linking two buses i
and j; Vi, Vj are the voltages at buses i, j ;
Re[Cki], Re[Ckj], Im[Cki], Im[Ckj] are the real
and imaginery parts of elements of current
distribution factor matrix C; PLj is the p_power
load at bus j.
(k)
i
arctan
N
Vo
jT(k
Q(jk )TX(k
)
R
j
(k )
(k )
TR(k ) ij cos
TX(k ) ij sin
xij sin
xij cos
;
;
(7)
(8)
j
(k )
(k )
j
j
where k is the number of iteration; Vi, are the
i
We can carry out the power system steady-
state optimization as shown in figure 1
bus voltage modul and argument; Vo is the
modul of slack bus voltage; N is the independent
bus quantity of electric network; rij, xij are the
real and imaginary elements of zbus matrix; Pj,
Q(k-1)j are the active and reactive bus powers;
During iterative calculation, the bus
q_power values are specified at the PQ bus,
(Q(k-1)j=Q(o) ), and the new modified expressions
j
to adjust the reactive power value at the PV bus
j are proposed as follow
Q(jk) V sin (k )Ip V cos (k )Iq
(9)
;
ie
ie
j
(k )
(k )
Pj cos
Q(jk ) sin
Vj(k )
(10)
j
j
Ip
;
(11)
(k )
(k )
Pj sin
Q(jk ) cos
j
j
Iq
Vj(k
)
(k )
(k )
rjjV(k ) sin
xjjV(k ) cos
z2jj
Vje
Vj(k
j
j
j
j
;
)
where Vje is the expected voltage modul at the
bus j;
The bus q_power at the PV bus j must be
satisfied
The load flow calculation is to determine
voltage and line flow, in a large electrical
network, for a given load and generation
schedule. Using the zbus matrix model
[4],[5],[6],[8] we can obtain the expressions to
compute the bus voltage as follow
Qj Q(jk 1)
Q(jk 1) Qj ;
(12)
if the inequality (12) is not satisfied for the bus
j, then the bus reactive power must be fixed at
the limit, and this bus can be traited as a PQ bus
in the next iteration.
In the case, to control the voltage at PV bus
j, the expected bus voltage at this bus can be
adjusted so that an inequality is satisfied
models for the power flow solution. Applying
this power flow model to p_power optimization
we can develop the following equations
(18)
P1g
P2g
b1
b2
a1
1
1
2
B11
2B12
a2
...
2B1m
2B2m
(k 1)
rjj cos
(13)
j
Vj Vj(k 1)
Q(jk 1) Vj ;
2B21
2
B22 ...
:
:
:
(Vj(k 1) 2
)
:
:
:
:
:
:
:
:
:
:
:
am
bm
2Bm1
2Bm2
...
2
Bmm
In case of branch m (linking two buses i, j)
1
mg
which characterized branch’s transfo-ratio
different from one unit, the bus voltages
depends upon the bus currents so the injected
transfo-model currents can be added to the bus
current, and we can compute the injected
transfo-model currents as follow
where Bij denotes the elements of a loss
coefficient matrix which can be found from [7]
(19)
cos(
V Vj cos cos
)
Bij
i
(14)
N ksJs CkiJ
1
N ksJs CkjJ
Re[JiT] tm 1)(Vj cos Gm Vj sin Bm)
Nb
s 1
t2m 1)(V cos Gm V sin Bm) ;
2
;
i
i
k 1
J
(15)
Im[JiT] tm 1)(Vj cos Bm Vj sin Gm)
where m is the generator bus quantity; N is the
load bus quantity; Nb is the branch quantity;
Cks, Cki, Ckj are the elements of current
distribution factor matrix; Js is the load current
at bus s; J is the sum of generator currents;
t2m 1)(V cos Bm V sin Gm) ;
i
i
(16)
Re[JjT
]
]
1 m)(V cos Gm V sin Bm);
i i
(17)
Vi,Vj are the generator voltages;
,
i
are the
Im[JjT
1 m)(V cos Bm V sin Gm);
j
i
i
angles between current and voltage of
generators i, j; cos , cos j are the power factors
of generators i, j.
i
where Re[JiT], Im[JiT], Re[JjT], Im[JjT] are the
real and imaginary parts of injected transfo-
model currents at the buses i and j; tm is the per-
unit transfo-ratio ; Gm, Bm are the real and
imaginary parts of admittance of transformer
branch m;
The process of power system steady-state
optimization implemented by search-method,
as the modified zbus model, can be also refered
to flow-chart shown on figure 1. Using these
algorithms to solve load flow problem we obtain
the same result of bus voltages in overall power
system. The main difference is to compare the
influence on the optimization results of two
different forms of equations (2) and (18) with
the different expressions of loss coefficients
(3),(4),(19), involved in determining the
technico-economic equivalent states [2] by
calculating the R magnitude which determines
the proximity state level to the optimum point
3.
AUGMENTED
RECTANGULAR
SYSTEM MODEL WITH THE EIGEN-
IMAGE ADMITTANCE MATRIX.
A new mathematical model [1] is proposed
for solving power flow problem using
augmented rectangular system with the system
eigen-image admittance matrix, a method to
create a mathematical model with a rectangular
jacobian matrix consisting of its almost un-
changed elements and also to receive a kind of
diagonal jacobian matrix for the simplicity of
the process of calculation. The results of its
application prove the advantages of this new
proposed model by comparison with the another
m
(20)
R
Pi2 ;
i 1
where Pi is the p_power deviations from
optimum p_power magnitude.
Assume that the existing Pi (i=1,2,…,m)
satisfy to an inequality
B11 a1
B21
B12
B22 a2
...
...
...
...
B1m
B2m
...
1
2
E1
;
...
Bm1
m
Pi2 R2 ;
(21)
Bm2
... Bmm am
i
where
(28)
m
then the system fuel cost increment is
BijPLj Boi
j
Cmax HR2 ;
;
( i );
(22)
i
where H is a number which must be found to
appreciate the sytem fuel cost increment. If a
Once the largest eingenvalue
matrix E1 is found, we can determine the
system fuel cost increment
of the
1max
maximum eigenvalue
of the estimative
max
matrix is computed, then it will be accepted [5]
as the number H in (22)
m
(29)
2 ;
i
1max
i 1
(23)
H=
max
4. EXAMPLE OF NUMERICAL RESULTS
in this case we have
4.1 Example 1.
m
(24)
2 ;
i
max
i 1
Let’s investigate a 220kV power system
consisting of 4 generators and of 7 loads. The
power system’s schema is shown in figure 2
the system fuel cost increment C is determined
as a quadratic function of the
p_power output deviations
estimative matrix E
generator
Pi with an
(25)
B11 a1
B21
...
B12
B22 a2 ...
...
B1m
B2m
...
E
;
...
...
Bm1
Bm2
... Bmm am
in general, the generator bus quantity n is less
than the bus total quantity in the whole power
system. The loss coefficient matrix B must be a
square matrix of (m×m) size as the form of (19).
Applying the (3) and (4), we can obtain the
modified expression of the system fuel cost
increment as follow
The linedata is given in table 1
m m
m
i
m i2 ;
(26)
j i
i2
j
1j 1
i 1
in case of (26), to estimate the equivalent state,
we propose a new modified expression of
estimative matrix E1 to stand for the matrix E
The numerical results of initial state
parameters calculation are presented in table 2
(27)
The modal matrix of the estimative matrix is
The eigenvalues are
The generator fuel cost functions are given
as follow
And we have
.0084;
C1=0.007P21g+3.9P1g+155, $/h; (50≤P1g≤275)MW;
C2=0.006P22g+4.5P2g+149, $/h; (50≤P2g≤250)MW;
C3=0.008P23g+3.2P3g+145, $/h; (50≤P3g≤300)MW;
C7=0.0065P27g+3.5P7g+147, $/h; (50≤P7g≤300)MW;
Using modified zbus model (MZbM) to
optimize the power system steady-state,
analogically, we have the main numerical results
of the problem of economic p_power generation
as presented in table 4
Using the augmented regtangular system
model (ARSM) with eigen-image matrix to
carry out the power system steady-state
optimization, we obtain the main numerical
results of the problem of economic p_power
generation as presented in table 3
The loss coefficient sub-matrix is
The loss coefficient matrix is
the system incremental fuel cost is
=7.15218;
b
Using the modified zbus model, we obtain the
estimative matrix E1 as follow
the system incremental fuel cost is
ARSM=6.8957;
In this case the estimative matrix E is
The modal matrix of the estimative matrix E1 is
4.2. Example 2.
Let’s investigate a standard IEEE 30bus
power system consisting of 4 generators. The
power system’s schema is shown in figure 3
In this case the eigenvalue matrix is
And we obtain H1 = 0013;
Applying (24) to estimate fuel cost
increment, we obtain CARSM=0.13$/h. Using
(29) to estimate fuel cost increment, we
obtain approximative
CMZbM=0.2027$/h. It
Investigating the economic equivalent state,
we have the numrical results as follow
means that both optimum results corresponding
to their mathematical models are technico-
economic equivalent.
Comparing the economic state parameters of
a power system loading 825MW, such as
incremental fuel costs xxx, fuel costs Cxxx and
transmission p_power losses Pxxx , from the
results of the two models above, we notice very
little differences between their magnitudes. The
numerical results are follow
The technico-economic equivalent parameters
are shown in table 5
C = CARSM – CMZbM = 0.052 $/MWh;
=
–
= -0.256 $/MWh;
ARSM
MZbM
The ARM model estimative parameters are
d P = PARSM – PMZbM = 0.046 MW;
If the maximum system fuel cost increment
is accepted in range of 1$/h, then the technico-
economic equivalent states must be found in a
globoil space (precision of economic equivalent
state) with radius R=10.91;
Comparing the optimum generator p_power
outputs of two cases presented above, we can
obtain the differences as follow
the number H is 0.2461, and the system fuel
cost increment is CARSM=10.6468$/h;
│ P1│=│196.09 –193.57│= │ 2.52│< R;
│ P2│=│187.12 –188.08│= │-1.96│< R;
│ P3│=│216.76 –218.90│= │-2.24│< R;
│ P7│=│239.17– 238.55│= │ 0.62│< R;
The MZb model estimative parameters are
The numerical results presented in the table
3 and table 4 show the voltage state parameters
set together are almost unchanged.
International Advanced Symposium on
Electrical Engineering.
3. Luu Huu Vinh Quang. Economic p_power
dispaching and load q_power compensation
in power system. Authorship testimonial
No63-15-3-2001- Copyright Office of VN.
4. Glenn W. Stagg, Ahmed H.El-Abiad.
Computer method in power system
analysis. McGraw-Hill 1983.
5. V.A. Venikov. Electrical Power System
Computing Programming and Optimization.
Moscow High School Edition 1973.
the number H1 is 0.2394, and the system fuel
cost increment is CMZbM=10.3570$/h;
Comparing
the
system
fuel
cost
increment C, we can conclude the both
optimum results corresponding to their
mathematical models are technico-economic
equivalent.
6. John J.Grainger & William D.Stevenson,JR.
Power system analysis. McGraw-Hill 1994.
7. Luu Huu Vinh Quang. A new P_Power loss-
coefficient expression and economic active
5. CONCLUSION
The modified zbus power flow model is
developed as (5)-(6)-…-(15)-(16)-(17).
power generation of thermal plans.
th
A new augmented regtangular system power
flow model [1] is proposed to power flow
optimization with new expression of loss
coefficient [7].
Proceedings of the 8 conference on science
and technology. p.1-6. Session Electrical
Engineering and Power systems. University
of Technology VNU HCMC.
This paper develops a method estimating the
technico-economic equivalent state [2] with an
estimative matrix which is determined by a
square and symmetric loss coefficient matrix of
(n×n) size in which n is the generator quantity
of a power system, including the slack bus
generator [7]. A new loss coefficient expression
[3] and a new modified expression (27) of
estimative number H are proposed. Using the H
and R magnitudes we can analyse the influence
of power system parameters on the technico-
economic equivalent state in electrical power
system operation with an estimative matrix E
obtained from the results of a power system
state optimization solving.
8. Hadi Saadat. Power system analysis.
McGraw-Hill 1999.
REFERENCES
1. Luu Huu Vinh Quang. Electrical Power
System steady-state simulation using
Augmented Rectangular System Model with
the Eigen-Image Admittance Matrix.
Authorship testimonial No1175/2004 /QTG -
Copyright Office of VN.
2. Luu Huu Vinh Quang. A method for
estimating the technico-economic equivalent
states in power system operation.
th
Proceedings of the 10 conference on
science and technology - University of
Technology VNU HCMC
-
2007
Bạn đang xem tài liệu "Comparing two power flow optimization algorithms by estimating technico-economic equivalent states", để tải tài liệu gốc về máy hãy click vào nút Download ở trên
File đính kèm:
comparing_two_power_flow_optimization_algorithms_by_estimati.pdf